Camfil Air Pollution Control (APC), a manufacturer of industrial dust, fume, and mist collection systems based in Jonesboro, AR, announced construction of a new manufacturing facility to replace its previous building that was destroyed by a tornado in March 2020. The new 254,000-square-foot facility, including a factory and office space, will be located in Jonesboro, AR, and is expected to be completed in early 2022. Since the tornado, the company has been conducting manufacturing operations from a rented facility, however, the filter cartridge production, warehousing, and shipping areas remained intact.

Camfil Group, Stockholm, Sweden, is the parent company of Camfil APC, which has 30 manufacturing sites, six R&D centers, local sales offices in 30 countries, and 4,800 employees.