← Back to search results
  • Publication Date: 11/01/2009
  • Organization(s):
    Columbian TecTank
  • Article Type: Case Histories
  • Subjects: Storage, System or equipment design, fabrication
An engineering company finds a way to improve its storage tank installation process.

Stanco Projects, a division of Semco Systems Ltd., designs, manufactures, and installs a wide range of turnkey bulk chemical handling systems for power, mining, and petrochemical facilities around the world. The company frequently installs chemical slurry makeup systems for produced water treatment at oil and gas facilities in northern Canada. Since many of the facilities are located in remote areas with limited access, shipping the tank and other equipment to a facility and assembling a system on-site is time-consuming and costly. Several years ago, the company decided to find a way to decrease the system installation time and costs.

Download PDF