|
|
Home) Item Details
Powder and Bulk Engineering is a technical information publication devoted to the powder and bulk solids industry within North America.
 |
 |
 |
 |
|
 |
 |
Item Details
Publication Date: 11/1988
Pages: 2
Medium:
PDF Format
US:
$7.50
To read this entire article:
You may purchase this article now for personal use. Simply click the Buy Item button above,
enter your payment details, and download the article. It will be available to you for 7 days
for viewing, printing, or saving for future reference. All articles are copyrighted by CSC
Publishing, Inc. and cannot be used for commercial purposes without express permission in
writing from the Publisher. This includes but is not limited to: web posting, printing, or sharing via email.
Security:
Your payment information is forwarded in an encrypted form, using 40- or 128-bit
Secure Socket Layer technology, only to our payment gateway (Authorize.net) for
processing.
To view an article, you must have Acrobat Reader installed on your computer. Click
on the icon to download Acrobat Reader free of charge.
|
|
Asphalt producer waits two years for pneumatic pump to fail -- it's still waiting
For many years, Western Paving, Inc., an asphalt production company located in Denver, Colo., had a serious problem. The granite dust collected by its dust collector was so abrasive that every 25 to 35 working days it destroyed the rotary airlock that moved the dust from the collector to a pneumatic air line and back into production.
Needless to say, repair and replacement costs were high, and downtime was frequent and lengthy. As an experiment in September 1986, Western Paving's management replaced the airlock with a pneumatic dry-material pump. If the pump withstood the abrasive dust for at least 4 months, they reasoned, the experiment would be a success. Two years later the pump is still on the job, working 6 days a week, 12 to 16 hours a day.
|
|
|
|